
Back when we learned that Apple’s VP of industrial design, Jony Ive, would be leading human interface development across the entire company, many hoped it would mean some big changes for iOS, after years of iterations that appeared minor compared with the major overhaul of Android 4.0 and beyond. With the Worldwide Developer Conference looming just months away, all eyes are on iOS 7, and according to Daring Fireball’s John Gruber, the push to meet its development targets is requiring the company to repurpose resources from the OS X team.
"What I’ve heard: iOS 7 is running behind, and engineers have been pulled from OS X 10.9 to work on it."
This wouldn’t be the first time Apple had to shift engineering resources around in...
via The Verge - All Posts http://www.theverge.com/2013/4/2/4176914/ios-7-behind-schedule-new-look
No comments:
Post a Comment